PTO Proposed Projects
Playground Area
Move board rails from lower playground and reposition them to the far set of swings. Place concrete curb around the interior edge of the walking track in center of play area, then add pea gravel to entire center area. Provide shading to each of the three benches with a pergola style structure.
Muddy Area at End of Building
School board is suppose to place a concrete walkway from parking lot to school walkway. The PTO would then like to landscape with variety of plants and mulch.
Stage Area in Cafeteria
Install hardware and curtain to stage area. This will probably be a two year project due to the cost.
Parking Lot
Place stopping blocks in parking spots nearest the wood area.
These are many of the projects the PTO would like to complete or at least save for with our upcoming fundraisers. Thank you again for all your participation and support of the Dandridge Elementary School Parent Teacher Organization.